I have made some progress on the tuners and bridge. In the image below, the pieces for the base plate of the bridge can be seen.
Tomorrow, I should receive the thread cutting tools I have ordered so that I can continue on the threaded plunger and tuner knob. In the meantime, I am also cutting myself a second styrofoam 3D prototype.